30 May 2023

SOIL INVESTIGATION WORKS FOR "RANCANGAN TEBATAN BANJIR SG. BUNUS WILAYAH PERSEKUTUAN KL, MEMBINA DAN MENYIAPKAN 'ONLINE STORAGE' SRI RAMPAI SERTA KERJA-KERJA BERKAITAN"

Location: Jalan Ayer Panas, KL
Duration: 2016
Contracting Parties: Jabatan Pengairan Dan Saliran (JPS)
Description: GSE was appointed to conduct site investigation to obtain subsurface information for Jabatan Pengairan Dan Saliran (JPS)

RIVER EMBANKMENT FAILURE STUDY AT SUNGAI BUNUS

Location: Jalan Ayer Panas, KL
Duration: 2016
Contracting Parties: Jabatan Pengairan Dan Saliran (JPS)
Description: GSE was appointed to conduct site investigation to obtain subsurface information for Jabatan Pengairan Dan Saliran (J

STRUCTURAL INTEGRITY STUDY ON CRACKED BUILDING COLUMN

Location: Jalan Gelang. Off Jalan San Peng,KL
Duration: 2016
Contracting Parties: DBKL
Description: GSE was appointed to conduct a visual inspection, 24 hours monitoring and consultancy services to analyze the structural integrity of the building.

EMERGENCY RESPONSE, GEOTECHNICAL STUDY & SUPERVISION OF RUBBLE WALL FAILURE

Location: Taman Tan Yew Lai,KL
Duration: 2015-2016
Contracting Parties: DBKL
Description: We assist our client in monitoring ground movement during the event of failure. GSE was also appointed to provide consultancyservices for the study of wall failure problem and responsible to ensure the effectiveness of the rectification measures through supervision.

SLOPE STABILIZATION AT MENARA TNB NO 12,13,20 & 21 132KV TALIAN CBPS-SHAS

Location: Tower TNB Setia Alam
Duration: 2016
Contracting Parties: TNB
Description: TENAGA NASIONAL BERHAD has invited our geotechnical professional team to conduct a geotechnical study, consultancy service and supervision of remedial works to protect TNB asset.

GROUND SETTLEMENT STUDY

Location: Tiara Titiwangsa,KL
Duration: 2016
Contracting Parties: DBKL
Description: GSE was appointed to provide consultancy services and design to address the ground settlement problems at Tiara Titiwangsa.

STUDY ON STRUCTURAL INTEGRITY FOR COAL UNLOADING JETTY AT SULTAN SALAHUDDIN ABDUL POWER STATION

Location: Kapar Selangor
Duration: 2016
Contracting Parties: KAPAR ENERGY VENTURE
Description: GSE was appointed to conduct a geotechnical and structure assessment on the existing coal unloading jetty belongs to KEV and determine the structure adequacy upon receiving 90,000 deadweight tonnage(DWT) ship docking. Modelling of the existing jetty structure has been carried out by utilizing ETABS computer software to generate the forces, moments and reactions acting on the structure.

CADANGAN KERJA KECEMASAN(AP55) BAGI KERJA - KERJA MEMBAIKPULIH BANGUNAN BLOK CHENGAL, IBUPEJABAT JABATAN PERHUTANAN SEMENANJUNG MALAYSIA KUALA LUMPUR YANG ROSAK AKIBAT KEBAKARAN

Location: Jalan Sultan Salahuddin Kuala Lumpur
Duration: 2016
Contracting Parties: Jabatan Perhutanan Semenanjung Malaysia
Description: Kumpulan ikram was appointed to under go restoration JPSM headquarters due to fire incident in 2016

Emergency Works
We also carry out emergency works which involve building, bridge, slopes, road, etc.
Highlighted Emergency Works Projects:

Kerja-Kerja Pembaikan Struktur Kawalan Banjir Dan Tembok Penahan Di Outlet Kolam Takungan Banjir Sri Rampai, Kuala Lumpur.

Client: Jabatan Pengairan Dan Saliran, Wilayah Persekutuan Kuala Lumpur (JPS)
Type of Services: Emergency works
Project Period: 7 months
Description Project: A government based project under the Jabatan Pengairan Dan Saliran, Wilayah Persekutuan Kuala Lumpur (JPS) Wilayah Persekutuan Kuala Lumpur. This project consists of 7 works which includes earthwork, remove debris, sheet pile upstream, sheet pile wall downstream, tieback, reinstate broken culvert and pipe jacking works.

Cadangan Kerja Kecemasan (Ap55) Bagi Kerja-Kerja Membaikpulih Bangunan Blok Chengal Ibu Pejabat Jabatan Perhutanan Semenanjung Malaysia Kuala Lumpur Yang Rosak Akibat Kebakaran

Client: Jabatan Perhutanan Sememanjung Malaysia (JPSM)
Type of Services: Emergency works
Project Period: 7 months
Description Project: A government based project under the Jabatan Perhutanan Sememanjung Malaysia (JPSM) Wilayah Persekutuan Kuala Lumpur. This project consists of 4 phases which includes immediate action, forensic works, design and rectification works.